Volt Industrial Group Satellite
Launch Instructions
*Launch
*Don't stop until you run out of fuel
*When the fuel runs out, turn on stage 2
*Continue and turn off the engines when you reach 130-250 km.
*When you lose speed and start falling on Droo, turn on the Engines instantly
*Fly at a pitch angle 10-0
*When the orbit stabilizes, stop the engine immediately
*Fill the last stage
Enjoy>
GENERAL INFO
- Created On: Android
- Game Version: 1.3.204.1
- Price: $32,926k
- Number of Parts: 54
- Dimensions: 43 m x 5 m x 5 m
PERFORMANCE
- Total Delta V: 6.5km/s
- Total Thrust: 6.5MN
- Engines: 12
- Wet Mass: 2.66E+5kg
- Dry Mass: 27,366kg
STAGES
| Stage | Engines | Delta V | Thrust | Burn | Mass |
|---|---|---|---|---|---|
| 1 | 7 | 1.8km/s | 3.8MN | 1.5m | 2.66E+5kg |
| 2 | 5 | 4.7km/s | 2.7MN | 1.5m | 1.17E+5kg |
No Comments
1 Upvote
Log in in to upvote this post.