MANGALYAAN

The Mars Orbiter Mission (MOM), also called Mangalyaan ("Mars-craft", from Sanskrit: ???? mangala, "Mars" and ??? yana, "craft, vehicle"), is a space probe orbiting Mars since 24 September 2014. It was launched on 5 November 2013 by the Indian Space Research Organisation (ISRO).[11][12][13][14] It is India's first interplanetary mission[15] and it made it the fourth space agency to reach Mars, after Roscosmos, NASA, and the European Space Agency.[16][17] It made India the first Asian nation to reach Martian orbit and the first nation in the world to do so on its maiden attempt.

The Mars Orbiter Mission probe lifted-off from the First Launch Pad at Satish Dhawan Space Centre (Sriharikota Range SHAR), Andhra Pradesh, using a Polar Satellite Launch Vehicle (PSLV) rocket C25 at 09:08 UTC on 5 November 2013.[22] The launch window was approximately 20 days long and started on 28 October 2013.[5] The MOM probe spent about a month in Earth orbit, where it made a series of seven apogee-raising orbital manoeuvres before trans-Mars injection on 30 November 2013 (UTC).[23] After a 298-day transit to Mars, it was put into Mars orbit on 24 September 2014.

The mission is a "technology demonstrator" project to develop the technologies for designing, planning, management, and operations of an interplanetary mission.[24] It carries five scientific instruments.[25] The spacecraft is currently being monitored from the Spacecraft Control Centre at ISRO Telemetry, Tracking and Command Network (ISTRAC) in Bengaluru with support from the Indian Deep Space Network (IDSN) antennae at Bengaluru, Karnataka.[26]
HOPE YOU LIKE THIS CRAFT

THIS THING HAS A LOOOT OF FUEL SO YOU'LL BE GETTING IN TO MARS WITH EASE, I HAD ONE STAGE AN 48% FUEL TO SPARE AFTER, I GOT TO MARS

GENERAL INFO

  • Successors 1 craft(s)
  • Created On: Android
  • Game Version: 0.9.404.0
  • Price: $73,813k
  • Number of Parts: 140
  • Dimensions: 99 m x 12 m x 13 m

PERFORMANCE

  • Total Delta V: 13.1km/s
  • Total Thrust: 32.6MN
  • Engines: 20
  • Wet Mass: 1.93E+6kg
  • Dry Mass: 1.16E+5kg

STAGES

Stage Engines Delta V Thrust Burn Mass
1 7 3.5km/s 24.7MN 2.5m 1.93E+6kg
3 1 2.8km/s 4.5MN 1.9m 2.93E+5kg
4 2 2.4km/s 3.0MN 52s 90,620kg
7 1 2.8km/s 260kN 2.3m 20,934kg
9 9 1.6km/s 168kN 31s 4,506kg

6 Comments

  • Log in to leave a comment
  • Profile image

    PLEASE UPVOTE IF YOU LIKE IT!! AND DO FEEL FREE TO TELL IF ANYTHING'S WRONG!

    Pinned 3.6 years ago
  • Profile image

    @TerTech The PSLV here isn't accurate, I just made it to resemble the mission.

    2.8 years ago
  • Profile image
    3,015 TerTech

    DID THE PSLV FIRST STAGE HAVE TO BE SOLID AND THE BOOSTERS LIQUID?????????

    2.8 years ago
  • Profile image

    @RevolutionAerospace Sir, Atlas IIAS rock banao? thik hai, zarur banaunga and thank you very much!!

    +2 3.6 years ago
  • Profile image

    @MSCSpaceworks Thank you, I put my heart in to making this thing!!

    +1 3.6 years ago
  • Profile image

    Amazing

    3.6 years ago

14 Upvotes

Log in in to upvote this post.