153 downloads

EDIT: The top 3 External Solar Panels on the 2nd stage will need to be changed back to "AG-Solar Panels" - I accidentally changed it to test something before I uploaded. It's always something, jeez!

Launched on our Signature Kronos Rocket.

There are 5 sets of 4 Satellites, each containing different experiments and testing instruments for use in Droo Low Orbit.

Our NeXen Satellite Pillar will be used to transfer and process data with all 20 of the Satellites, after release.

AG1- Beacon Lights
AG2- External Lights
AG3- Release Set 1 (Top)
AG4- Release Set 2
AG5- Release Set 3
AG6- Release Set 4
AG7- Release Set 5 (Bottom)

NeXen Pillar can only be released via docking port after all 20 Cube Satellites are detached. (Or you can leave it attached to 2nd stage)

Activate Solar Panels AFTER the Cube Satellites are detached

If I missed anything, gimme a shout!

Enjoy!

Zeva Industries

GENERAL INFO

  • Successors 1 craft(s)
  • Created On: Windows
  • Game Version: 0.9.404.0
  • Price: $31,163k
  • Number of Parts: 937
  • Dimensions: 58 m x 4 m x 4 m

PERFORMANCE

  • Total Delta V: 4.8km/s
  • Total Thrust: 6.4MN
  • Engines: 11
  • Wet Mass: 1.87E+5kg
  • Dry Mass: -207,712kg

STAGES

Stage Engines Delta V Thrust Burn Mass
1 7 2.5km/s 5.3MN 54s 1.68E+5kg
3 4 2.3km/s 1.1MN 68s 50,849kg

1 Upvote

Log in in to upvote this post.