Due to the rollout of SLS in around 10 days, I've decided to share my recreation of SLS Block 1! For those of you who don't know, SLS is NASA's ride back to the moon, slated to deliver the first humas back to lunar orbit in 2023 or 2024. SLS is also going to be instrumental in the construction of the gateway space station.

Activation Groups

  1. Abort
  2. Capsule RCS
  3. Main Engine
  4. Maneuvering Engines
  5. Solar Panels
  6. Docking Port
  7. Service Module RCS
  8. Main Parachutes

Well thant's all for now, so I'll se you guys in the next post!

GENERAL INFO

  • Successors 1 craft(s)
  • Created On: iOS
  • Game Version: 0.9.802.0
  • Price: $28,707k
  • Number of Parts: 359
  • Dimensions: 79 m x 6 m x 12 m

PERFORMANCE

  • Total Delta V: 9.0km/s
  • Total Thrust: 12.3MN
  • Engines: 20
  • Wet Mass: 5.67E+5kg
  • Dry Mass: 69,054kg

STAGES

Stage Engines Delta V Thrust Burn Mass
1 6 5.1km/s 10.4MN 3.9m 5.67E+5kg
3 0 0m/s 0N 0s 3.08E+5kg
5 1 2.6km/s 239kN 5.9m 45,779kg
6 9 1.4km/s 64kN 7.8m 28,296kg

7 Comments

7 Upvotes

Log in in to upvote this post.